INSTALLED CAPACITY | |||
SL.No. |
Power Station |
Installed Capacity (MW) |
M P SHARE |
(MW) | |||
1 | Amarkantak Extn (210 MW) | 210 | 210 |
2 | Satpura II (200+210 MW) | 410 | 410 |
3 | Satpura III (2x210 MW) | 420 | 420 |
4 | Satpura IV (2x250 MW) | 500 | 500 |
5 | Sanjay Gandhi, Birsinghpur -I (2x210 MW) | 420 | 420 |
6 | Sanjay Gandhi Birsinghpur -II (2x210 MW) | 420 | 420 |
7 | Sanjay Gandhi Birsinghpur -Extn (1x500 MW) | 500 | 500 |
8 | Shri Singaji TPS Dongalia (2x600 MW) | 1200 | 1200 |
9 | Shri Singaji TPS Dongalia Phase II (2x660 MW) | 1320 | 1320 |
Total Thermal Power Station Generation | 5400 | 5400 | |
1 | Gandhi Sagar(5x23 MW) | 115 | 57.5 |
2 | Pench,Totladoh(2x80 MW) | 160 | 107 |
3 | Rani Awanti Bai Bargi (2x45 MW) | 90 | 90 |
4 | Ban Sagar I Tons(3x105 MW) | 315 | 315 |
5 | Birsinghpur(1x20 MW) | 20 | 20 |
6 | Rajghat (3x15 MW) | 45 | 22.5 |
7 | Ban Sagar II Silpara(2x15 MW) | 30 | 30 |
8 | Bansagar -III Deolond (3x20 mW) | 60 | 60 |
9 | Bansagar -IV Jhinna (2x10 MW) | 20 | 20 |
10 | Madhikheda (3x20 MW) | 60 | 60 |
Jawaharsagar & Ranapratapsagar Station of Rajasthan (99MW & 172 MW), 50% of 271MW | ---- | 135.5 | |
Total Hydro Power Station Generation | 915 | 917.5 | |
Total | 6315 | 6317.5 |